Monday, Jun 10, 2024
Advertisement

India to get Rafale fighter jets in 3-year time: IAF chief

Arup Raha said the fighter jets, capable of carrying nuclear weapons and equipped with latest missiles, will tremendously increase the force's capability.

Rafale fighter jets, Rafale fighter jets from france, Rafale fighter jets India, IAF chief Arup Raha, Light Combat Aircraft (LCA), India's fighter jets, Indian Air force, indian express news Dassault Rafale fighter jet is capable of carrying nuclear weapons, equipped with latest missiles. REUTERS/Benoit Tessier

India will get the first tranche of Rafale fighter jets from France in the next three years, Indian Air Force chief Arup Raha said on Saturday. “Rafale contract caters for delivery time between 36 months to about 66 months if I am not wrong. So within three years time we will have the first few aircraft delivered to us and within five and a half years we will have two full squadron of aircraft in operation,” Raha said at a function in Kolkata.

Watch what else is making news:

Arup Raha said the fighter jets, capable of carrying nuclear weapons and equipped with latest missiles, will tremendously increase the force’s capability. When asked about the depleting strength of jets, he said besides Rafale, India is going to produce Light Combat Aircraft (LCA) Tejas in large numbers.

Advertisement

“The effort is on to increase production lines. The more the number of aircraft we produce, the faster we ramp up the capacity to close the gap created by obsolete and old aircraft,” Raha said. IAF has put on display one such obsolete MiG-27 fighter aircraft in front of the Netaji Subhas Chandra Bose International Airport in Kolkata. The installation was inaugurated by the Air Chief Marshal. He also said the government is also thinking of procuring another fighter aircraft to fill up the gaps faster.

On the Indo-Russian fifth generation fighter aircraft (FGFA), Raha said they are already working with Russia on research and development. “The project is already negotiated. Preliminary design on our part is over and if this R&D negotiations are over and we sign the contract then we should have these aircraft in another 5-6 years,” Raha said.

Lok Sabha Election Results 2024: Full list of winners

First uploaded on: 10-12-2016 at 23:05 IST
Latest Comment
Post Comment
Read Comments
Advertisement
Advertisement
Advertisement
Advertisement
close