ISSN No:-2456-2165
Abstract:- This research was conducted to get a better outside vendor it takes a relatively longer time and often
and more effective schedule in a project compared to even exceeds the time agreed upon with the vendor.
the existing one that was made by combining all the
time needed in each task and also to know the factors Here are some projects related to vendors and their
that caused the delay in project because of the project timeframe and realization of the process,
studied in this research was delayed for 11 days. The
project itself is data transformation project. Which is
an endeavor undertaken to adjust company's internal
data with other companies or vendors for specific
purpose. There will be sacrifices incurred by the
company both in time and financial if the schedule takes
too much time and if there's a delay in the project. For
this reason, researcher wants to apply a scheduling
method which is CPM to find out whether the
scheduling is effective or not and to further explore
what factors are causing delayed project which is
happen to the case the researcher studied on. In this
case, researcher using tools such as work breakdown
structure and fishbone diagram to find the root cause of Fig 1:- Research Framework
the problem and apply PDCA as an endeavor of
improvement. The expected result is getting a better This figure shows that most of the project samples
schedule and the main factors that cause delay so that it taken exceeded the specified schedule. This is seen from
can be used to improve the effectiveness of next project. top management as being less competent than the IT team
itself apart from the role of other teams in addition to the
Keywords:- CPM, Project, Schedule, Delay, Fishbone. effort and additional costs that need to be incurred due to
extend over the allotted time. In addition, in the
I. INTRODUCTION implementation of the process, there are many more
detailed steps that should be regulated in such a way that
Every company in the face of the times will always the project work time is not necessary as long as it is now,
develop and try to achieve better targets than before by where currently the schedule is determined linearly where
involving all the elements and components that play a role the total working time is the total hours for each activity
in the company. Of course, every component in the carried out in a project.
company has their respective strategies in achieving the
vision of the company, especially the special section or II. METHODS
division that plays a direct role with the information system
because it is directly dealing with the advancement of A project can be interpreted as a temporary effort
information technology that is very fast developing. taken to create a unique product, service or outcome. 1 The
research methodology used on to this project describes the
To cope with this situation, companies usually procedures regarding the research steps that are arranged
teaming up with smaller companies or vendors to handle systematically. A systematic step is needed so that the
the situation. Complementing with the vendor is expected research can be carried out properly and the planned
to meet the needs of the company, but in its implementation research objectives can be achieved. This research refers to
there is a similar problem that always arises for each the background and is oriented towards the interests of the
vendor working together, namely adjusting company data company and refers to the formulation of the problem.
with the data needed for consumption by the vendor,
hereinafter referred to as data transformation. Existing data Based on the type and design of the study, this study
in the company is in accordance with the pattern of uses a quantitative approach (quantitative research). This
consumption of internal needs so that when using an study describes a process / event, phenomenon or event and
certain analysis so that this research enters into a
descriptive analytical type of research where the research
A - 16
B - 2
C A 16
D - 2
E B, D 4
F E 4
G E 2
H C, F, G 4
I H 1
J I 16
K I, J 24
L K 1
Table 1:- Project Tasks
Figure 1 is made of table 1 to find the Critical path of the project. Where E (Earliest) and L
(Longest) tiime can be found then the critical path can be determined ie when the value of E = L or E - L = 0 (zero slack) for
each of the same activity.3
The project activity pathway represented by the diagram are A, C, H, I, J, K, L whose completion time is 78 days. This
shows a very significant improvement compared to the normal running of this project (up to 92 days).
Besides, this significant increase in time can allow more optimal work on the project with the availability of spare time
remaining to cover the shortage of time if things happen that are unexpected. However, in reality it turned out that this project
took place beyond the initial 92 day schedule. For this reason, using a fishbone, a detailed search of the causes of this has been
carried out as described below:
This figure shows that the factors are : the maintenance process is complete and as time goes
by more and more viruses and malware can threaten the
Machine : Technological advances have pushed all IT security of company data, to prevent it, new regulations
divisions to use the latest technology as well, this has are being made which when the project is running
affected the disruption of ongoing projects, in this case access to folder sharing becomes complicated because it
access to data has been shut down due to adjustments to has to go through a server with upload and download
the new technology. The server system is also regularly processes which are much slower in its implementation
maintained to maintain its stability and performance. to ensure that the transferred data is safe from harm.
When this is done data access also cannot be done until
Man : Actually, from several points of human factors After further review using a fishbone diagram, the
beyond natural disasters, illness or other urgent factors that cause delays in this project are machine,
conditions the core cause is the turnover rate in the IT material, method, human, measurement and environment
field is indeed very high, this causes problems factors. Where the main cause lies in the human factor on
propagating both in the shortage of qualified workers, the problem of high turnover that raises the problem on
the number of replacement person in charge that is other factors. Which in this study the researchers tried to
sometimes lacking the analysis capability compared to apply PDCA especially in the Planning section to maintain
the previous pic. the schedule and monitor the available manpower so that it
can be improved on subsequent projects.
Measurements : The Timeline determination is
incorrect. This is common because there is no Recommendations
calculation done when closing monthly or there is In determining the project schedule it is better to know
maintenance with an existing system where in fact this in advance how the process is in it so that when
point is also closely related to the man power factor. determining the schedule, it is set effectively, which in this
case using CPM. For further research to conduct research
Environment : When there is an earthquake, flood and that examines the high turnover in the IT field as discussed.
riot the office is closed for a special day so that the
work process is completely stopped. REFERENCES
This is where the PDCA cycle is used, which is a [1]. Schwalbe, K. (2015). An Introduction to Project
cycle for continuous improvement so that the results of this Management, Fifth Edition. Schwalbe Publishing.
study can be beneficial to both the company and the [2]. Sudalyanto. 2016. Implementasi Kaizen-PDCA
following research described as follows: Untuk Menurunkan Produk Reject (Non
Conforming) Di PT Tozen Mechanical Product.
Plan : Applying a schedule calculation method to
maintain the effectiveness of the project (minimizing Universitas MercuBuana. Jakarta
the occurrence of time wasted). After that, the project [3]. Purnomo, J., Krisnaningsih, E., & Khadijah, A.
management officer approached both the IT and user (2018). OPTIMALISASI WAKTU PENJADWALAN
teams so that they recognized and knew everyone's PEMBUATAN SEPATU PULLOVER MODEL
capabilities, as well to change from user minded project QUESA DENGAN METODE PERT. Jurnal InTent:
into a project based where the priority was placed on the Jurnal Industri Dan Teknologi Terpadu, 1(1), 24-35.
continuity and validity of the project's results rather than [4]. Heizer, Jay and Render Barry, (2015), Manajemen
merely pursuing time schedules. Besides that, they also Operasi : Manajemen Keberlangsungan dan Rantai
held discussions with human resource department to Pasokan, edisi 11, Salemba Empat, Jakarta.
find a way to reduce turnover in companies, especially
IT teams which tended to be higher.